RETAILSUPPLY THAI

Wall systems

Slatwall Kick vs Open Toe of the Bay

Published 31 August 2026 · 4 min read

Empty bottom grooves are unfinished spec. Name a kick leftover. Put height and projection on the quotation. No universal millimetre.

Slatwall kick versus open toe of the bay is leftover millimetres finished at the base — empty bottom grooves are unfinished spec. Independent shops in Thailand leave the last pitch raw because leftover millimetres still took a hook. The shops that look finished specify a kick leftover or a low shelf leftover, not an open-toe forest. We do not publish a universal millimetre.

Base deck and kick plate is the kit. Slatwall base vs kicker finish is the family. Slatwall base vs open bottom is the open-bottom sibling. Panel layout is the bay. This page is kick leftover versus open toe.

What each job is for

Named kick leftover. A recessed or flush toe so people can stand at the wall. Remaining walk after projection — aisle width. Unused millimetres finish as trim. Grocery-deep leftover millimetres kill boutique walk. How to measure: named leftover millimetres at the base. Put height and projection on the quotation.

Named low-shelf leftover. Shoes, bags, boxed goods at the bottom pitch — slatwall shelf depth. A lip if it walks. Mixed leftover kicks, leftover hangers, and leftover dumps on leftover millimetres photograph as unfinished spec.

Not an open-groove city. Empty grooves to the mop line are unfinished spec. Humidity: the edge at the floor is the wet line. Layout. Two-metre decompression: raw grooves in the door are still in the door. Gondola already has a kick — do not copy a supermarket module onto a boutique perimeter.

Window: one story, not the open toe in the glass. Opening priority: wrap and walk before leftover hooks in the last grooves. Load: we do not invent kilograms. Corner trim finishes the edge.

When kick leftover vs open toe

JobNamed kick leftoverOpen toe grooves
Toe space, remaining walk after projectionStrongUnfinished spec
Low shelf, lipped, ticketsStrong as shelf leftoverUnfinished spec
Grocery-deep leftover millimetresNeverNever
Universal millimetre on the blogNeverNever
Remaining walk after depthNamedNamed

Common mistakes

  • Empty bottom grooves as leftover millimetres.
  • Grocery-deep kick leftover in a boutique bay.
  • Hook forest at ankle height.
  • A universal millimetre instead of height on the quote.

What belongs on the quotation

  1. Kick leftover vs low-shelf leftover — named split, millimetres for both.
  2. Remaining millimetres at the floor finished as trim, not extra hooks.
  3. Remaining walk after kick projection.
  4. Height and projection on the quotation. No universal millimetre.
  5. Language of the document, Thai or English.

Send photos of the leftover bay toe. That is enough to specify a kick leftover instead of an open-groove forest.

Finish leftover millimetres at the base

If you are closing a slatwall bay in Thailand, do not leave the last grooves open as leftover millimetres. Send the shop type, the size, and the opening month through the fixture plan form. We will return one fixture schedule and one written quotation — Thai or English — covering the kick leftover, the open toe, and the walk.

Common questions

Leave empty bottom grooves as leftover millimetres?
No. Name a kick leftover. Unused millimetres finish as trim. Remaining walk after projection belongs on the quotation.
Copy a supermarket kick onto a boutique bay?
No. Grocery-deep leftover millimetres kill boutique walk.
Hook forest at ankle height?
No. One family per leftover. Mixed leftover photographs as unfinished spec.
Publish a universal millimetre on the blog?
No. Height and projection belong on the quotation. We do not invent kilograms.

Want a fixture list that fits your shop?

Tell us the shop type, size and opening date. We build one fixture plan and one written quotation, in Thai or English.

Get my fixture plan

All guides

02

Contact us for sourcing and quotations

Contact us directly for specifications, sourcing and written quotations.